Selective demolition and removal of the loading dock behind Building 300. Demolition was carried out to the edge of the building, taking care not to damage the building itself.
Continue reading “VA Hospital Building 300 Loading Dock”Selective demolition and removal of the loading dock behind Building 300. Demolition was carried out to the edge of the building, taking care not to damage the building itself.
Continue reading “VA Hospital Building 300 Loading Dock”