Fast Forward Concrete Cutting partnered with PCL Construction to perform selective demolition and precision concrete cutting at the UCLA Engineering VI Building, focusing on the 5th floor and roof.
Continue reading “UCLA Demolition & Concrete Cutting Project”Contractor: Sierra Pacific Contractors
AT&T Infrastructure Project
Fast Forward Concrete Cutting partnered with H.C. Olsen Construction on a specialized demolition and concrete cutting project for AT&T at the MER-8 Pod and Air-Cooled Chiller facility in Los Angeles.
Continue reading “AT&T Infrastructure Project”Japanese American National Museum Project
Fast Forward Concrete Cutting was proud to partner with Sierra Pacific Contractors on the selective demolition phase of the Japanese American Museum renovation in Los Angeles. This high-profile cultural site required precise, careful execution to ensure both safety and preservation throughout the project.
Continue reading “Japanese American National Museum Project”