Fast Forward Concrete Cutting partnered with PCL Construction to perform selective demolition and precision concrete cutting at the UCLA Engineering VI Building, focusing on the 5th floor and roof.
Continue reading “UCLA Demolition & Concrete Cutting Project”Project: Concrete Cutting
AT&T Infrastructure Project
Fast Forward Concrete Cutting partnered with H.C. Olsen Construction on a specialized demolition and concrete cutting project for AT&T at the MER-8 Pod and Air-Cooled Chiller facility in Los Angeles.
Continue reading “AT&T Infrastructure Project”CSUN’s Chaparral Hall
Fast Forward Concrete Cutting is happy to partner with the esteemed general contractor Hathaway Dinwiddie to execute selective demolition and precision cutting at CSUN’s Chaparral Hall (Science 5 Building).
Continue reading “CSUN’s Chaparral Hall”McCadden Affordable Senior Housing
Fast Forward was called in by a general contractor for a concrete coring and cutting project at a 70,000-square-foot building in Los Angeles for seniors.
Continue reading “McCadden Affordable Senior Housing”Los Angeles City College
Fast Forward was hired to remove two chillers from the existing cooling tower at Los Angeles City College’s Central Plant.
Continue reading “Los Angeles City College”LA Veterans Admin
Fast Forward was called in by a general contractor for a project to convert an abandoned building at the VA facility into Veteran’s Housing.
Continue reading “LA Veterans Admin”UCLA – CHS
Concrete cutting, breaking and removal inside UCLA’s Center for the Health Services (CHS) took skill and careful planning to support state-mandated seismic retrofit.
Continue reading “UCLA – CHS”Cal-Poly Pomona Library
Removing concrete panels while Cal-Poly Pomona University Library continued to be used required some clever engineering.
Continue reading “Cal-Poly Pomona Library”