Fast Forward was called in by a general contractor for a concrete coring and cutting project at a 70,000-square-foot building in Los Angeles for seniors.
Continue reading “McCadden Affordable Senior Housing”Project: Concrete Cutting
Los Angeles City College
Fast Forward was hired to remove two chillers from the existing cooling tower at Los Angeles City College’s Central Plant.
Continue reading “Los Angeles City College”LA Veterans Admin
Fast Forward was called in by a general contractor for a project to convert an abandoned building at the VA facility into Veteran’s Housing.
Continue reading “LA Veterans Admin”UCLA – CHS
Concrete cutting, breaking and removal inside UCLA’s Center for the Health Services (CHS) took skill and careful planning to support state-mandated seismic retrofit.
Continue reading “UCLA – CHS”Cal-Poly Pomona Library
Removing concrete panels while Cal-Poly Pomona University Library continued to be used required some clever engineering.
Continue reading “Cal-Poly Pomona Library”