Fast Forward Concrete Cutting was proud to partner with Sierra Pacific Contractors on the selective demolition phase of the Japanese American Museum renovation in Los Angeles. This high-profile cultural site required precise, careful execution to ensure both safety and preservation throughout the project.

Project Details

Project Type: Demolition
Location: 100 N. Central Ave, Los Angeles, CA 90012
General Contractor: Sierra Pacific Contractors

Start Date: July 27th, 2025
Finish Date: Sep 16th, 2025

removing wall insulation during selection demolition phase
sweeping up floor during selection demolition phase
stairway exposed during selection demolition phase
ceiling ductwork exposed during selection demolition phase
pic 1 - wood block flooring removed during selection demolition phase
pic 2 - wood block flooring removed during selection demolition phase
pic 3 - wood block flooring removed during selection demolition phase
pic 1 - mezzanine structure exposed during selection demolition phase
pic 2 - mezzanine structure exposed during selection demolition phase
japanese-american-national-museum-demolition-01-min
japanese-american-national-museum-demolition-02-min
japanese-american-national-museum-demolition-03-min
japanese-american-national-museum-demolition-04-min
japanese-american-national-museum-demolition-05-min
japanese-american-national-museum-demolition-06-min
japanese-american-national-museum-demolition-07-min
japanese-american-national-museum-demolition-08-min
japanese-american-national-museum-demolition-09-min
previous arrow
next arrow

Scope of Work:

We provided complete floor protection according to the project’s protection plan, including plywood for the path of travel and Masonite across key areas. Our skilled crew completed a comprehensive list of demolition tasks, including:

  • Partition wall and millwork removal.
  • Demo of wood block flooring & carpet.
  • ACT grid and hard-lid ceiling removal.
  • HVAC duct, light fixture, and wall covering removal.
  • Steel stairs and mezzanine structure demolition.
  • Salvaging donor plates and signage per graphics guidelines.
  • Careful removal of roller shades, railing, TVs, and water fountain.

Each element was tackled with the highest level of care to maintain site integrity and prepare for the next phase of construction.

End Result:

“The job is almost done, with full protection and precision. The team did a great work.”

We are proud of our role in preserving the history and supporting the future of this vital institution. Thank you to Sierra Pacific Contractors for the continued trust.